Runtime Limits Tab
Runtime Limits ensure that a Job or Workflow runs for a predefined period of time or does not exceed a time limit. Multiple Runtime Limits are allowed on a single Job or Workflow Definition, and each can be either a Minimum or a Maximum value. When a Runtime Limit is reached, an Event or Alert can be raised to request intervention from an Operator.
Note: Job runtime includes Pre Running action time as well as the time the Job stays in Running status, but excludes post-running Action time.
The Runtime Limits tab includes the following controls.
Values
Field | Description |
---|---|
Name | The name of the Runtime Limit. |
Type | The type of Runtime Limit: Maximum or Minimum. |
Entered Value |
The Runtime Limit. You can specify a Runtime Limit in the following ways.
|
Set Job to Error | Lets you specify whether the Job should be set to Error status if it reaches the Runtime Limit. |
Event Definition | Lets you specify an Event to be raised if the Job reaches the Runtime Limit. |
Ad Hoc Alert Source | Lets you specify an Ad hoc alert to be raised if the Job reaches the Runtime Limit. |